ADP Schemes 2024-25

Details of ADP Schemes (On-going & New)

S#ADP#Name of SchemeTypeTotal Cost (M)Allocation
(M)
Rleases (M)Utliization
1962/180178Capacity Building of Directorate of Information and Establishment of Social Media Cell for Chief Minister Khyber Pakhtunkhwa (KP)On-going
143.21
24.59.00100%
2963/190229 Construction, Restoration and Rehabilitation of Press Club on Need BasisOn-going7477100%
3965/210204Study for Sustainable Operation of Existing Radio Stations in Khyber Pakhtunkhwa (KP)On-going151500%
4970/200044Up Scaling of Information Setup in Merged Districts (AIP)On-going266.092520%
5733/240326Strengthening the Information Communication Infrastructure of the DGIPR, Khyber PakhtunkhwaNew350000%
6734/240327Paid Content on MediaNew1000000%